Henan Hengyuan Crane Machinery Group Co., Ltd.
  TEL: 86-373-3765556
You are here: Home » News » Trial Run

Trial Run

Views:4     Author:Site Editor     Publish Time: 17-05-2017      Origin:Site

Before the trial run, add 30# mechanical oil into the turning decelerator until the oil reaches the middle position of the oil marker. (Oil shall be replaced once every 6 months.) Press the buttons to check whether the turning directions comply with the indicating signs of the switch. If not, adjust the phase-sequence of lines. Run the crane without any load for several minutes and the crane can be put into normal operation if the trial run shows no abnormal phenomena. 

13

Contact us

   ADD: NO.6 Juren Ave.,Henan Crane Industrial park
  TEL: 86-373-3765556
   Mobile: 0086 15136762436
   FAX: 86-373-3765556
  Mail:  sales@hycranecn.com

INQUIRY

More >>